跳至内容

Applying Engineering Change Orders to Service Product

Allows users to apply Engineering Change Orders to Service products.
174.41 € 174.41 € (不含税)
US$ 200.00 (不含税)

  • Versions
条款及条件细则
30 天退款保证
送货:2 至 3 个工作天


ODOO'S FUNCTION

In Odoo Standard, Engineering Change Orders (ECOs) is designed strictly for physical manufacturing. It allows you to control changes to the Bill of Materials (BoM) and production steps. 

CLUEDOO'S FUNCTION

CLuedoo allows users to apply ECOs to Service products. They treat a service as a "process-based product" that also needs version control. ECOs can be used to update your service steps, approval flows, or standard operating procedures.

CONFIGURATION

Create a new product or choose existing product > Set up Product Type as Service

USAGE

Go to Product Lifecycle Management > Create a new Engineering Change Order > Select a Service Product in the Product field.